Which ISO 8573-1 Class Do You Need? A 5-Question Decision Tree

Marin Hu, Field Engineer
Marin Hu

Field Engineer

ZIQI Compressor Group

ZIQI · Est. 2007200 Export MarketsField Engineer

A five-question walk-through that maps your process to an ISO 8573-1 purity class, a pressure dew point target and the right compressor architecture - using published figures, not guesswork.

Updated October 2026

Which ISO 8573-1 Class Do You Need? A 5-Question Decision Tree

Authored by ZIQI's field engineering team; ZIQI products mentioned are manufactured by the publisher.

3 scales

Particles, water and oil are graded separately - purity is a three-part specification

Source: ISO 8573-1:2010

-40 °C

Desiccant pressure dew point ZIQI pairs with Class 0 for pharmaceutical API contact

Source: ZIQI cleanroom sizing guidance

$26,640

10-year energy penalty of filtering a 75 kW oil-flooded machine toward near-Class 0

Source: ZIQI published worked example

Class 2-3

Normally sufficient for general fabrication and pneumatic conveying

Source: ZIQI published industry guidance

WHO THIS IS FOR

Process engineers, quality managers and procurement teams who know their industry but not their purity class - and want to land on a defensible ISO 8573-1 specification before a supplier writes one for them.

ISO 8573-1 defines the scales, but it does not tell you which class to buy - that choice is yours, and it gets written into the purchase contract as an agreed specification between buyer and supplier. Pick too low and you risk the product, the process or the piping. Pick too high and you pay a capital and energy premium every year for purity your process never uses. As an air compressor manufacturer that builds both oil-flooded and oil-free machines, ZIQI walks buyers through the same five questions before quoting a class. This guide lays that walk-through out.

Quick answer: if compressed air touches the product directly - pharmaceuticals, food contact, semiconductor surfaces - specify ISO 8573-1 Class 0 and size a desiccant dryer for the dew point your process demands. If the air only drives tools and actuators in a general manufacturing or fabrication setting, Class 2 to Class 3 with a correctly budgeted dryer and filtration train is normally sufficient. Everything between those poles is decided by the five questions below.

1. The Decision Tree at a Glance

1
What does the compressed air touch? Direct product contact pushes you up the oil scale; tool drive and actuation leave you in the middle bands.
2
What does one contamination event cost you? A scrapped batch or a destroyed wafer justifies architecture, not filters; an oily fitting is a maintenance ticket.
3
How dry must the air be? Water is a separate scale with its own class number - pick a pressure dew point target and let it dictate the dryer, not the compressor.
4
What does the environment feed the machine? Dusty, corrosive or intake-hostile sites load the particulate scale and the filtration budget.
5
How will the class be verified? Decide the test report you will demand before you sign, not after commissioning.

2. Questions 1 and 2: Product Contact and Consequence Severity

The oil scale is the one that drives capital cost, because oil in the compression chamber is an architectural property - you cannot inspect it away after purchase. ZIQI's published industry guidance maps applications to oil classes as follows: pharmaceutical cGMP manufacturing, food and beverage lines where air contacts the product directly, and semiconductor photolithography environments all specify Class 0. General fabrication and pneumatic conveying sit at Class 2 to Class 3, where specifying Class 0 is capital spent without a return.

Question 2 is the risk-weighting step, and ZIQI's comparison page puts the asymmetry in one line: the cost of one contaminated pharmaceutical batch typically exceeds the price premium of an oil-free compressor by 10 to 50 times. If a single failure event costs more than the architecture premium, the architecture decision has already been made for you. If the worst case is a clogged fitting or a stained workpiece, stay in the middle bands and spend the difference on a proper dryer.

3. Question 3: How Dry? The Water Scale Is Separate

Purity is always a three-part specification, and the water class is the one most often forgotten. The clearest published example comes from ZIQI's cleanroom sizing guidance: compressed air in direct contact with active pharmaceutical ingredients - vial blow-off and fluid bed dryers - requires ISO 8573-1 Class 0 oil combined with a -40 °C desiccant pressure dew point to eliminate microbial proliferation risk. Read that carefully: the Class 0 number covers oil only. The -40 °C figure is a separate water requirement delivered by a desiccant dryer, and it does not appear anywhere in the oil class table.

For most general manufacturing, the water requirement is the binding constraint rather than the oil class. Air at Class 2 or Class 3 oil will run a fabrication shop indefinitely; air that condenses in the piping will not. Budget the dryer and the filtration train as their own line items, and set the dew point from the coldest surface the air will ever touch - not from the compressor brochure.

4. Question 4: What the Environment Feeds the Machine

Class 0 does not mean zero contaminants exist in the ambient air drawn into the compressor; it means the compressor itself adds zero total oil. An intake that sits beside a diesel bay, a loading dock or a spray booth will pull in whatever is in the air and pass it through. That intake reality loads the particulate scale and the inlet filtration budget independently of your oil class decision - and it is one of the two details most often missed when a class is copied from a competitor's datasheet.

5. Question 5: Verification Before You Sign

Whatever class you land on, decide the evidence before signing. Ask for the ISO 8573-1 test report for the specific model from an independent laboratory rather than an internal factory declaration; ask which standard the test method follows; and confirm that the class written into the purchase contract is the class the report demonstrates. ISO 8573-1 provides the scales - the class assignment itself is agreed between buyer and supplier, which is exactly why the verification paper trail matters. For the full class table from Class 0 to Class 4 and the six questions that survive a procurement review, see the ISO 8573-1 air quality classes guide.

6. Industry Landing Points

ApplicationTypical oil classPaired requirementSource
Pharmaceutical cGMP manufacturing (API contact, vial blow-off, fluid bed dryers)Class 0-40 °C desiccant pressure dew pointZIQI cleanroom sizing guidance
Food and beverage (PET blowing, packaging, fermentation - direct product contact)Class 03-A Sanitary Standards documentation typically requiredZIQI published industry guidance
Semiconductor and microelectronics (photolithography, wafer handling)Class 0ISO 5 / ISO 6 cleanroom particulate envelopeZIQI published industry guidance
Automotive paint and coatingHydrocarbon-free airPrevents fisheyes and craters from oil vapourZIQI published industry guidance
General fabrication and pneumatic conveyingClass 2-3Dryer and filtration budgeted as separate line itemsZIQI published industry guidance

Class assignments are agreed between buyer and supplier in the purchase contract. Source: ZIQI published industry guidance, ziqi-group.net.

7. The Cost Boundary: Where Filtration Stops Making Sense

The decision tree has one financial cliff worth naming. Buyers who need near-Class 0 purity on an oil-flooded machine often try to filter their way there. ZIQI's published worked example prices that route: a 75 kW oil-flooded compressor running 6,000 annual hours at $0.12 per kWh, pushing air through the filter train needed to approach Class 0, burns a conservative 0.7 bar of extra pressure - about $2,664 per year, or $26,640 over ten years, purely to push air through the filters. With that penalty added, the 10-year total cost of the oil-flooded route rises from $43,000 to $69,640, against $34,000 for an oil-free machine.

That is the boundary in the decision tree: if your process lands at Class 2 or Class 3, filtration on an oil-flooded machine is the economical route. If your process genuinely needs Class 0, filtering toward it costs more over ten years than buying the architecture that produces it natively. The full arithmetic is in the ISO 8573-1 classes guide, and the ten-year cost model behind both routes is in the total cost of ownership guide.

Frequently Asked Questions

Is Class 0 always the best choice?
No. Class 0 is a specification agreed between supplier and user, and specifying it where the process does not demand it is capital spent without a return. ZIQI's published industry guidance puts general fabrication and pneumatic conveying at Class 2 to Class 3, where the water and particulate requirements are usually the binding constraint rather than the oil class.
What ISO 8573-1 class does food and beverage packaging need?
ZIQI's published industry guidance specifies Class 0 for PET blowing, packaging and fermentation lines where the air contacts the product directly, with 3-A Sanitary Standards documentation typically required. Air that never touches the product can sit at a lower class - map each line separately before writing the specification.
Does Class 0 cover water and particles too?
No. ISO 8573-1 grades particles, water and oil on three independent scales, so a purity specification is always three parts. The published pharmaceutical example pairs Class 0 oil with a separate -40 °C desiccant pressure dew point, because microbial risk in API contact air is a water problem that no oil class number addresses.
Can filtration turn an oil-flooded compressor into a Class 0 machine?
No. Filtration approaches purity at a running energy cost: ZIQI's worked example prices the filter train penalty on a 75 kW oil-flooded machine at about $2,664 per year, or $26,640 over ten years, for roughly 0.7 bar of extra pressure. Class 0 is delivered by keeping oil out of the compression chamber architecturally, not by filtering downstream.
How do I verify a supplier's purity class claim?
Ask for the ISO 8573-1 test report for the specific model from an independent laboratory rather than an internal factory declaration, and ask which standard the test method follows. Confirm that the class written into the purchase contract matches the class the report demonstrates - the class assignment itself is agreed between buyer and supplier, so the paper trail is the enforcement mechanism.
What does over-specifying a purity class cost me?
Two ways: capital for oil-free architecture or deep filtration your process never uses, and the running energy that filtration adds - the published example shows the oil-flooded route with a Class 0 filtration train rising from $43,000 to $69,640 over ten years against $34,000 for a native oil-free machine. Specifying from the decision tree avoids both.
Does the ISO standard fix a class for each industry?
No. ISO 8573-1:2010 defines the measurement scales and class limits; it does not mandate which class an industry must buy. The class is your specification, informed by process risk and written into the contract - which is why the five questions above, not a competitor's datasheet, should drive the number you sign.

Need Your Class Specification Written?

Send ZIQI your process, product contact points and site conditions. Our engineers will return a purity specification with the matching architecture and test documentation. Or email sales@ziqi-group.com directly.

Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --
Chat
Now

Send your inquiry

Choose a different language
╳
العربية
Беларуская
Deutsch
Ελληνικά
English
Español
français
Magyar
italiano
Nederlands
Português
русский
Current language:English